               do prediction and awareness of en-route        the operations. An example is the ATMOPSP
               wake vortex to pilots and controllers. It was   believing the Loss C2 Link is just a communi-
               noted that there are not enough reports of     cations failure, when the C2 link encompasses                       completed and it remains to finalize the
               this issue and although there were report-     much more than just communications, and so                          guidance material. Work has been started
               ing systems (ICAO and others) for en-route     needs to be classified as an emergency.                             on amendments to the Aerodrome Design
               wake vortex encounters (and other incidents)                                                                       Manual.
               they are not widely used or known to Pilots    PERFORMANCE BASED NAVIGNATION STUDY
               and operators.  The new RECAT system was       GROUP (PBNSG)/25                                                    There was an update from the Wildlife
               discussed and it was mentioned that there      This was primarily another editorial meeting                        Hazard Management Expert Group (WH-
               appears to be a discrepancy between EURO-      to try and complete the rewrite of the PBN                          MEG) and it was agreed that there is a
               CONTROL/EASA and the FAA as to how to          manual. Nearly 600 comments were reviewed                           need to work on a standardized taxonomy
               deal with airplanes that do not have a RECAT   and validated by the two editorial working                          of what should be reported as wildlife
               category yet (for example, those in the certi-  groups, ATM and Functions.                                         strikes.
               fication process), or have 2 categories in Doc
               8463.                                          The schedule for completing this rewrite has                        There were discussions concerning the
                                                              now slipped and there will be a further review                      need for a risk-based approach for autho-
               REMOTELY PILOTED AIRCRAFT SYSTEMS              of the document at the November meeting                             rized UAS and protecting airports from
               PANEL (RPASP)                                  in Cologne. From there, it will be sent out to                      unauthorized UAS and how to address this
               This was the second of three Panel meetings    various ICAO Panels (NSP/SASP/ATMOPSP/                              serious issue. Other discussions included
               planned for this year. The contents of Work-   FLTOPSP/IFPP) for comment between 01 De-                            proposed amendments to Annex 14 relat-
               ing Paper 3 dominated the meeting. ICAO has  cember 2019 and 31 January 2020. The final                            ing to Taxiway lighting requirements for
               adopted a policy limiting panels and commit-   meeting in March will complete the docu-                            CAT II operations below 350m, various
               tees to not more than one meeting per year.    ment and any further meetings will be deter-                        lighting requirements, providing guidance
               This will potentially have a significant impact   mined by ICAO after that date.                                   for converting a taxiway into a standby
               on the work of the RPAS Panel (RPASP) and                                                                          runway and the progress on the develop-
               its delivery of SARPs, Procedures, and guid-   PERSONNEL TRAINING AND LICENSING EX-                                ment of the Heliport Manual.
               ance material. The revised proposal from the   PLORATORY MEETING (PTL EM)
               Panel will be for one formal meeting, such as   ICAO convened a group of experts in an                             OBSTACLE LIMITATION SURFACE TASK
               a Panel Meeting, to be held in March of each   exploratory meeting regarding personnel                             FORCE (OLSTF)
               year and then an informal meeting, such as     training and licensing the week of July 8. The                      The Task Force continues to review the
               a Working Group of the Whole (WGWHL),          Personnel Training and Licensing Exploratory                        current Obstacle Limitation Surfaces (OLS)
               to be held in the October/November period      meeting (PTL EM) was held as a direct re-                           and has proposals on revised surfaces that
               each year. Regardless of if the proposal is    sponse to the concerns raised by States and                         would reflect the type of operations and
               approved, the deadlines for all the work on    International Organizations on amendment                            aircraft in use today. In addition, as the
               the SARPS and guidance material will now be    proposals distributed in State Letter 2018/77                       new surfaces; Obstacle Free Surface (OFS)
               delayed considerably. At best, there will be a   to Annex 1 and PANS TRG. A number of is-                          and Obstacle Evaluation Surface (OES) will
               two-year delay, making it 2026, but it is pos-  sues were withdrawn from that State Letter                         require an Aeronautical Study. The Task
               sible there may be a four to five-year delay.  and marked for future work as well as other                         Force has now developed a full description
                                                              items that have been in the same domain.                            of an Aeronautical Study and how it will be
               Work continued in the working groups devel-    The objective of the PTL EM was to determine                        conducted.
               oping Standards and Recommended Prac-          the scope of the subjects needing develop-
               tices (SARPS) and guidance material for the    ment by an expert group in training and                             The package of the proposed changes to
               integration of international IFR operations by   licensing, and to make those recommenda-                          the Standards and Recommended Prac-
               Remotely Piloted Aircraft (RPAs).              tions to the ANC to determine what kind of                          tices (SARPs) and guidance material will
                                                              group would best satisfy those needs. There                         be submitted for Aerodrome Design and
               Working Group 5 is the Operations Group        were about 45 experts from several State                            Operations Panel (ADOP) and (Instrument
               and IFALPA assisted in the work to con-        Regulatory agencies, International Organiza-                        Flight Procedures Panel) IFPP’s endorse-
               vert the existing Part IV to Annex 6 into the   tions, and the ICAO Secretariat.                                   ment in the third quarter of 2021, and sub-
               required format as requested by the ICAO                                                                           mission to the Air Navigation Commission
               Secretariat. This is now broadly aligned with   Design and Operations Working Group                                (ANC) by no later than the first quarter of
               Annex 6 Part I. It is a long process and only   (ADOP/WG)                                                          2022 for the SARPs to be effective by 2024.
               the first four chapters have been completed.   IFALPA was called upon to comment on                                Instead of the usual two years applicability
               The next meeting will hopefully see the other   several papers during this busy meeting.                           date, the Task Force has suggested that,
               chapters completed. In the meantime, the       The Standards and Recommended Practices                             in order for the States to make changes to
               WG will look at what is needed in the form of   (SARPS) for the Standardized taxiway nam-                          any zoning laws and legislation, that the
               Appendices and Attachments. There is con-      ing convention presented by Airports Council                        applicability date should be 2028.
               cern with ensuring other Panels understand     International (ACI) and IFALPA have been
   25   26   27   28   29   30   31   32   33