Page 35 - InterPilot2019Issue2
P. 35

PAGE 35
















































        a reliable indicator of safety perfor-  essary Working Papers for the ADOP.  Working Group 5 is  the Operations
        mance worldwide.                    Aerodrome Design  and Operations  Group and IFALPA assisted in the work
                                            Panel  and  Instrument Flight Proce-  to convert the existing Part IV to An-
        Obstacle Limitation Surface Task    dures Panel (IFPP).                nex 6 into the required format as re-
        Force (OLSTF)                                                          quested by the ICAO Secretariat and
        The Task Force has been working over  Performance Based Navigation     this is now broadly aligned with An-
        a number of years, reviewing the cur-  Study Group (PBN SG)            nex 6 Part I.   A new Working Group
        rent  Obstacle  Limitation  Surfaces  The  Study  Group  is  nearing  the  end  has been formed to rewrite the RPAS
        (OLS) and working on revised surfaces  of a long process of rewriting the PBN  Manual.  The Manual will be in 2 vol-
        that would reflect the type of opera-  Manual.  This meeting in March was  umes; Volume 1 will contain an Over-
        tions and aircraft in use today.  In ad-  primarily an editorial meeting as there  view of RPAS International IFR Opera-
        dition, as the new surfaces; Obstacle  is a need to complete the manual by  tions;  and  Volume  II  will  contain  the
        Free Surface (OFS) and Obstacle Eval-  the end of the July meeting.  The man-  Implementation  of  RPAS  Provisions.
        uation  Surface  (OES)  will  require  an  ual would then be sent out to various  The  Working  Group  (WG  8)  will  be
        Aeronautical Study, the Task Force has  ICAO  Panels  (NSP/SASP/ATMOPSP/  made  up  from  representatives  from
        now developed a full description of an  FLTOPSP/IFPP)  for  comment  26  Au-  all the other WGs.
        Aeronautical Study and how to do this  gust  -  25  October.    However,  there
        Study.                              were  still outstanding  issues  related  ICAO Panel Project Team (PPT) for
                                            Advanced RNP and VNAV which took  the next edition of the Global Air
        This meeting resulted in the consoli-  most of the week long meeting to re-  Navigation Plan (GANP) Face to
        dation of several concepts and the TF  solve.                          Face Meeting (F2F)
        now  has  a  firm  proposal  for  revised                              The Panel Project Team (PPT) was set
        surfaces.  Further coordination will be  Remotely Piloted Aircraft Systems   up to help develop all the various
        necessary  with  the  Instrument  Flight  Panel RPASP                  threads and modules for the Aviation
        Procedures Panel (IFPP) to ensure the  This was the first of three Panel meet-  System Block Upgrades (ASBUs) which
        proposed  surfaces do not pose any  ings planned for this year. Work con-  form part of the Global Air Navigation
        issues with existing and future proce-  tinued  in the  working  groups  devel-  Plan (GANP).
        dures.                              oping  Standards  and  Recommended
                                            Practices (SARPS) and guidance mate-  Most of the work of the PPT has been
        The next meeting will be for an edito-  rial for the integration of international  carried by selected ICAO Panel mem-
        rial team to work on the text for Aero-  IFR  operations  by  Remotely  Piloted  bers and updated via conference calls
        nautical Studies and prepare any nec-  Aircraft (RPAs).                but this face to face meeting was to
   30   31   32   33   34   35   36   37